Resident
Engineer Fulton Engineering, Inc. January 2012 – Present
Greater Denver Area
Multiple responsibilities on this project, worked both as the Resident
Engineer and also provided Inspection duties. Gathered daily productions
reports from the other inspector and tabbed all units placed to create
reports. Provided clean set of redlines and asbuilts. Signed all units agreed
to with the construction project manager, sent in the required paper work to
the main office to generate the 521 forms as this was as ARRA project.
Responsible for making design changes t on project if and where needed.
Numerous other responsibilities as well.
Contract Osp Engineer: Engineering
Associates March 2011 – September 2011
Sherwood, Or
Aerial make ready, pole inventory. Building entrances, road moves.
NESC , RUS. Field staked a new conduit project for future FTTH along a rural
route all units were RUS. Road Moves.
Engineering Manager:
Canby Telephone Association
Canby, Or 2009- 2010
Responsible for
all outside plant engineering and design for the Canby exchange.
Managed three
company reports and one contractor. The contractor was there for a short term
project.
Staked and designed
new fiber for selected areas. Introduced new technology, Maxcell, & seven
way future path and micro fiber where feasible. Specifications of equipment,
including but not the FDF and pig tails to the pothead splice.
Handled multiple
projects ongoing at the same time. Created and maintained good working
relationships with the cities, counties and state departments. Developed and
maintained working relations with various vendors. Obtained all required
easements & permits for new construction. Engineered fiber to an existing
cell site and work with multiple stakeholders and property owners. Started
the planning process to provide fiber to all cell sites with the serving
area.
Field staked the
projects and Prepared , materials lists & cost estimates for all
projects & completed work order package for construction. Reviewed
contractor invoices and approve them. Created a new three to five year plan
for future growth and problem areas. Worked on training 2 of my reports to
learn field staking and engineering requirements while doing projects.
Responsible for
Capex budget creation, monitoring and tracking all work orders & projects
to ensure they were within budgeted amount. Had work order approval authority
up to $25K. Reworked and priced out 23 miles of buried fiber for a stimulus
proposal.
Conducted meetings
with reports to create a better team relationship and address any concerns or
problems and any recommendations to better improve the engineering department
as a whole. Conducted performance reviews and appraisal evaluations for
engineering staff. Coached and mentored engineering staff as required.
Engineering
Manager:
FairPoint
Communications
Yelm, WA 2007-2009
Responsible for
all outside plant engineering and design for the Yelm & Ellensburg
exchanges.
Managed three
company reports and up to four contract engineers. Responsible for capex
budget creation, monitoring and tracking all work orders & projects
including inside plant work orders to ensure they were within budget. Had
work order approval authority up to $25K. Introduced new technologies to
maximize capital budget and prepare for future
Expansion.
Designed a new
large subdivision development with fiber to the home. Specifications of equipment,
including but not limited too the fiber cross connect, fiber sizing for
present and future , splice cases, manholes and hand holes where feasible.
Handled multiple projects ongoing at the same time. Engineered new road moves
working with the state and county depending on who was involved in the
projects. Attended pre construction meetings. Created and maintained good
working relationships with the cities, counties and state departments.
Developed and maintained working relations with various vendors. Obtained all
required easements & permits for new remote sites, road moves, plant
upgrades and as needed. Engineered three new fiber fed remote sites using
Occam BLC cabinets. This provided fiber to the home capability in the area as
well as shortening the copper loop lengths. There was very little aerial
cable in the Yelm exchange. I also covered the Ellensburg exchange with the
same responsibilities’.
Developed a three
–five year plan for assigned areas. Work on other projects in Idaho and
Kansas as well as Missouri.
Field staked the
projects and Prepared , materials lists & cost estimates for all projects
drafted & completed work order package for construction. Reviewed
redlines and posted and closed work orders in a timely fashion.
Conducted biweekly
meetings with co, construction and engineering departments to keep everyone
up to date on all projects and the various stages to keep tracking
information up to date.
Conducted meetings
with reports to create a better team relationship and address any concerns or
problems and any recommendations to better improve the engineering department
as a whole. Conducted performance reviews and appraisal evaluations for
company personal. Coached and mentored employees as required.
Senior Engineer : (Accepted Engineering Manager position) Fairpoint
Communications Yelm, WA 2006-2007
Responsible for
all outside plant engineering and design for the Yelm exchange. Work on other
projects in Idaho and Kansas as well as Missouri.
Field staked the
projects and Prepared , materials lists & cost estimates for all projects
drafted & completed work order package for construction. Reviewed
redlines and posted and closed work orders in a timely fashion. Engineered
new road moves working with the state and county depending on who was
involved in the projects. Attended pre construction meetings. Created and
maintained good working relationships with the cities, counties and state
departments. Developed and maintained working relations with various vendors.
Obtained all required easements & permits for new remote sites, road
moves, plant upgrades and as needed. Routine work orders and PCR reports
staked projects to place new copper and upgrade as needed. Responsible for
capex budget creation, monitoring and tracking all work orders & projects
including inside plant work orders to ensure they were within budget.
Multiple other
responsibilities.
Outside Plant Engineer:
Westshare
Services
Yelm,
WA
2005-2006
Worked on premise
at Fairpoint Communications. Field staked the projects and Prepared,
materials lists & cost estimates for all projects drafted & completed
work order package for construction. Reviewed redlines and posted and closed
work orders in a timely fashion. Engineered new road moves working with the
state and county depending on who was involved in the projects. Attended pre
construction meetings. Created and maintained good working relationships with
the cities, counties and state departments. Developed and maintained working
relations with various vendors. Obtained all required easements & permits
for new remote sites, road moves, plant upgrades and as needed. Routine work
orders and PCR reports staked projects to place new copper and upgrade as
needed. Attended trade shows and multiple conferences. Started the planning
process for future fiber rings. Worked on a plan to shorten loop lengths and
begin the staking phase. Count rearrangements.
Outside Plant Engineer:
Atco
Communications
Wabash IN,
WA
2003-2005
Worked on premise
at Verizon. Field staked the projects and Prepared , materials lists &
cost estimates for all projects and completed work order package for
construction. Reviewed redlines and posted and closed work orders in a timely
fashion. Engineered new road moves working with the state and county
depending on who was involved in the projects. Attended pre construction
meetings. Created and maintained good working relationships with the cities,
counties and state departments. Obtained all required easements &
permits for new road moves, plant upgrades and as needed. Routine work
orders and PCR reports. Staked projects to place new copper and upgrade as
needed. Both aerial and buried copper facilities.
Outside Plant
Engineer:
S & H
Associates
Gig Harbor,
WA
2001-2002
Worked off premise
for Centurytel, Routine and project engineering. Osp road moves, new subdivisions, routines and projects. Road and
bridge work including new hwy overpass installation. Rehab work, aml removal,
pair gain devices, count rearrangement, ect. State hwy and county permit and
public utility department work included. Worked for 4 (Centurytel) engineers
in their areas with required daily assignments. Designed both aerial and
copper projects. Field staked the projects and Prepared , materials lists
& cost estimates and drafted the projects in Autocad and completed work
order packages for construction.
Outside Plant Engineer:
Westshare
Services
Gig Harbor,
WA
1999-2001
Worked on premise
at Centurytel. Routine and project engineering. Osp road moves, new subdivisions, routines and projects. Road and
bridge work including new hwy overpass installation. Rehab work, aml removal,
count rearrangement, ect. State hwy and county permit and pud work included.
Worked for 4 (Centurytel) engineers in their areas with required daily
assignments. Designed both aerial and copper projects. Field staked the
projects and Prepared , materials lists & cost estimates and drafted the
projects in Autocad and completed work order packages for construction
Outside plant Inspector:
Mid – States
(Temptel)
Fairbanks,
AK
1999-1999
Worked on premise
at PTI. Inspected assigned construction crew. Both rural and city work was
done under this contract. It covered both buried copper and aerial copper.
This was also REA/RUS work. Ensured all units were placed as shown on
engineers prints and that all work was done in a safe manor. Enforced all
depth requirements and all other work was done to clients specifications.
Provided redlines and asbuilts on a weekly basis. Maintained a good working
relationship with the city and county representatives.
Field Representative:
C.H. Guernsey &
CO
Oklahoma City,
Ok
1997-1999
Worked off
premise in local branch office for an independent phone company. Staked
projects associated with a five fiber ring upgrade. The staking took place in
the fall and winter .In the summer I did inspection on other engineers
projects.
As this project was being done under a federal loan all REA/RUS
specifications were followed and enforced.
Conducted
testing of all new cable after shipment arrived and recorded results.
Provided relines and asbuilts on a weekly basis. Once cable was place tested
it again and then talked and tested every pair and recorded
results.
During a slow period of time went to Iowa and worked on premise at GTE doing
routine and project work. Also conducted a 911 Audit in the field to match
records. This lasted about three months and then returned back to project and
stayed until completed.